Water treatment

Design, manufacturing and comprehensive supply of equipment

Gas Systems JSC carries out a full range of works on design, manufacture and integrated supply of process equipment, supervision of installation works and commissioning of new and reconstructed water supply systems.






GAS SYSTEMS JSC OFFERS A COMPREHENSIVE SOLUTION TO OPTIMIZE THE OPERATION OF THE COOLING SYSTEM:



  • Inspection of facilities and collection of initial data
  • Simulation analysis
  • Engineering design
  • Manufacturing and supply of equipment
  • Construction and erection works
  • Commissioning works
  • After-sales service
  • Supply of reagents





SOLUTIONS FOR WATER TREATMENT PLANT (WTP) AND WATER SOFTENING PLANT (WSP) AT CHP-PLANTS:

Standard problems of the water treatment and water softening plants at CHP-plants:



  • Low energy efficiency of the used equipment (increased consumption of heat, electricity and reagents compared to modern equipment)
  • Such plants occupy large areas and require a significant number of operational personnel
  • There is a need in modernization of treatment facilities (to reduce fines under Federal Law № 416-FZ)
  • Progressive expenses for maintenance and repairs



THIS LEADS TO:



  • Progressive increase in the cost of process water and increase in waste water treatment costs
  • At most stations, non-compliance with the requirements of Federal Law № 416-FZ poses a threat of penalties and requirements for the modernization of wastewater treatment plants
  • The increasing risks of emergency interruptions in the water supply of stations due to the high deterioration of the equipment of water treatment plants



TASKS AND SOLUTIONS



  • Improving the reliability of equipment
  • Introduction of new energy-efficient technologies
  • Reduction of operating and repair costs
  • Reduction of fines and environmental risks

OPTIMIZATION OF RECIRCULATING COOLING SYSTEMS

Payments for water supply and wastewater constitute a significant part of the costs for many CHP-plants. The issue of saving water will only increase, as water tariffs are indexed annually on average, significantly increasing the rate of inflation.



The main part of water costs at CHP-plants associated with the area of operation of circulation systems and is accounted for by water consumption and sanitation for technological needs, up to 70% of which is spent on purging. Due to the complexity of technological schemes of circulating water supply systems, a large number of units to control actions with a low level of automation, enormous length, as well as a high degree of deterioration of shut-off valves, networks and communications, it is impossible to guarantee the preservation of the achieved positive dynamics of decline over the horizon of two or more years.



Optimization of the water chemistry in circulation systems using scale and corrosion inhibitors reduces water costs (by increasing the recirculation rate) and reduces the risks of calcium deposits on heat exchanging surfaces.



GAS SYSTEMS JSC OFFERS A COMPREHENSIVE SOLUTION TO OPTIMIZE THE OPERATION OF THE COOLING SYSTEM:



  • Inspection of facilities and collection of initial data
  • Simulation analysis
  • Engineering design
  • Manufacturing and supply of equipment
  • Construction and erection works
  • Commissioning works
  • After-sales service
  • Supply of reagents