Realized Projects
Design, supply, installation and commissioning of packaged gas treatment stations (filtration, flow metering, pressure regulation, heating) as part of the projects execution under the program of Capacity Delivery Agreements (CDA-1) in the period 2010-2015.
Supply of packaged gas treatment stations
Development of design documentation, procurement, supply, execution of construction/ installation and commissioning works for the construction of two start-up and heating boilers with a heating capacity of 23 MW and a steam production capacity of 10 t/h for thermal power plants in the South of the Russian Federation.
Construction of heating boilers
Development of engineering documentation, procurement, supply, execution of the equipment installation supervision works and commissioning works for a gas pressure regulation and distribution station for the construction of the TPP under “Power of Siberia” project.
Supply of gas pressure regulation and distribution station
Design and site survey works on the project: "Implementation of technical solutions for reducing the noise impact from the roof fans of the main building of PGU-220T and fans of dry air water cooler, increasing the efficiency and reliability of dry air water cooler operation at CCPP-220 of the TPP belonging to Gazprom Group.
Implementation of technical solutions for reducing the noise impact from the roof fans
Design and site survey works on the project: "Retrofitting of ventilator cooling tower No. 2 of power unit No.8 CCPP-420T" at the TPP belonging to Gazprom Group.
Retrofitting of ventilator cooling tower
Execution of design and site survey works, procurement, supply, execution of construction/ installation and commissioning works on the project of installing a pipeline pumping station in the South of the Russian Federation.
Execution of works for pumping station
Execution of design and site survey works, procurement, supply, execution of construction/ installation and commissioning works on the project of installing a flue gas condenser for deep recovery of heat from outgoing flue gases of PTVM-120 boilers.
Installing a flue gas condenser for deep recovery of heat from outgoing flue gases
Design, procurement, supply, execution of the equipment installation supervision works and commissioning works for the installation of natural gas custody metering unit with ultrasonic flow meters at seven thermal power plants belonging to Gazprom Group.
Installation of natural gas custody metering unit
Development of engineering documentation, procurement, supply, execution of the equipment installation supervision works and commissioning works for a gas pressure regulation and distribution station for the construction of thermal power plant.
Gas pressure regulation and distribution station for the construction of thermal power plant
Design, procurement, supply, execution of the equipment installation supervision works and commissioning works for the installation of natural gas custody metering unit with ultrasonic flow meters at seven thermal power plants belonging to Gazprom Group.
Optimization in recirculated cooling water systems
Development of engineering documentation, procurement, supply, execution of the equipment installation supervision works and commissioning works for a boosting compressor station (BCS) based on screw compressors for thermal power plants.
Supply of boosting compressor station
Execution of design and site survey works, procurement, supply, execution of construction/ installation and commissioning works on the project of installation of a flue gas condenser unit after boilers.
Installation of a flue gas condenser unit